The masonry work for the trash enclosure has begun. I call this the very expensive enclosure as it includes building a cement pad with rebar, masonry work and steel doors that are custom made. Because it is such a small job for the vendors it was next to impossible to find a mason who would do the work and a steel fabricator to make the doors. The forms for the walkways had been set. But due to the inclement weather the cement was never poured.

Above: Trash Enclosure
Walkway