After our long journey, we are able to see the light. Today we passed an important electrical inspection. All the power outlets are in. The appliances are connected. The panel boxes are in and the breakers are in. And, so today, Silicon Valley Power, was given instruction to bring power to the building. Tomorrow we will be checking to see how the power is actually working.
So to date, we have water and power. Now we are awaiting PG&E. The phone lines have been brought to the building, and now that we have electricity we can actually connect a phone inside. We have working toilets and sinks inside.
Only thing outstanding are some plumbing connections to faucets and our multiple sinks - cattery, feeding room and in the grooming room.


The painting began with earnest. First the gold color highlight went on. Then came the light brown. The bright white building now took on the final paint colors.